產(chǎn)品詳情
The mold design of the concrete isolation pier is based on the premise of meeting the needs of the guests, the processing cost is low, the processing difficulty is small, the processing time is short. To do this, not only need to fully understand the needs of customers, in the injection molding machine, cement block mold structure, processing technology and mold factory capacity, and so on.
因此,為了提高混凝土隔離墩模具設(shè)計水平,應(yīng)該做到以下幾點,首先理解每個模具設(shè)計細節(jié),了解模具的每一部分;其次一個類似的設(shè)計,在設(shè)計時參考和理解其他模具加工和生產(chǎn)的產(chǎn)品,吸收經(jīng)驗和教訓(xùn);再者更多地了解注塑機的工作過程,深化模具;后理解、處理和產(chǎn)品過程中知道每個進程。知道模具廠設(shè)計的模具的變化,從錯誤中吸取教訓(xùn)。混凝土隔離墩模具生產(chǎn)不僅需要技術(shù),更需要維護獲悉,必須醒來后脫模模具清洗,以確保沒有混凝土表面和污點,下次將使用剩余模具硬化表面不光滑的石頭制成的水泥,影響使用。
Therefore, in order to improve the design level of the concrete pier mould, the following points should be done, first of all, understand each mould design details, understand each part of the mould; second, a similar design, in the design of Reference and understanding of other mold processing and production products, absorb experience and lessons; in addition to more understanding of the injection molding machine working process, deepen the mold; after understanding, processing and product process to know each process. BE AWARE OF MOLD design changes in the mold factory and learn from mistakes. The concrete isolation pier mold production not only needs technology, but also needs maintenance to know, must wake up after demoulding mold cleaning, in order to ensure that there is no concrete surface and stains, the next time will use the remaining mold to harden the surface of the non-smooth stone made of cement, affect the use.


